MassDOT Route 114 Corridor Improvements – North Andover – Project Construction Update

Route 114 Corridor banner

Project Construction Update 

July 23, 2026

What's New?

  • This summer, through August 2026, the contractor anticipates the following construction and site preparation activities along the Route 114 project corridor:
    • Excavation and grading will take place for the future shared-use path between the Andover Bypass and Willow Street, beginning as early as Monday, July 27, and continuing through August.
      • Work is anticipated to start at the Andover Bypass and progress east towards Willow Street.
    • Utility work is expected to continue in the project corridor, including, but not limited to, the following activities:
      • Saw cutting of roadway surfaces to support utility installation
      • Installation of water insertion valves
      • Utility pole relocation
      • Gas utility relocation, beginning in late August.
    • Route 114 center median removal and temporary paving at intersections throughout the corridor are expected to continue through September. Temporary traffic control devices will be placed in lieu of the median.
    • Continued site preparation activities at properties slated for demolition at the intersection of Route 114 and Hillside Road in North Andover, including installation of temporary construction fencing and related preparation work at 582, 591, 599, and 607 Turnpike Street. Demolition activities are expected to begin this summer.
    • Installation and maintenance of erosion control, sediment control, and stormwater protection measures in advance of and alongside upcoming work activities.
    • Test pitting (soil sampling and utility investigation) at various locations on Route 114 throughout the corridor are anticipated to continue through September.
    • Material deliveries will occur to project work sites and active work zones.

When is this Work Happening?

  • Work activities are scheduled on weekdays, Monday – Friday, during the summer construction season.
  • Work hours are from 7:00 a.m. to 3:00 p.m.

How Will this Affect You?

  • Lane shifts, traffic control devices, and police details may be required on Route 114 in the project limits to support these activities for public and worker safety.
  • Construction signage will remain in place and may be adjusted as needed to support shifting work areas and maintain safe travel through the corridor.
  • Access for pedestrians and emergency services will be maintained.
  • Drivers traveling through the affected areas should expect delays, reduce speed, and use caution.

Stay Connected: 

  • For more information on the Route 114 Corridor Improvements in North Andover, please visit our website at this link.
  • To reach the project team, please email NorthAndoverRoute114@dot.state.ma.us or call the project hotline phone number at (978) 906-8694.
  • If you have been forwarded this email, and would like to receive project updates and traffic advisories, please subscribe for updates here