Sat 8 Nov 2025 – Whittier Tech Veterans Breakfast


Joseph LeBlanc, MSW, LCSW
OIF/OEF Army Veteran
District Director Veterans' Services
North Andover/ Boxford
Executive Board Member Massachusetts Veterans Services Association
Member National Association of County Veterans Service Officers
VA Accreditation Number: 48144

120 Main St.
North Andover, Ma 01845
978-688-9525                                                                                             
VA HEALTHCARE APPLICATION HERE: https://www.va.gov/find-forms/about-form-10-10ez/
Massachusetts Veteran Chapter 115 Benefits Estimator:https://vets.mass.gov/
                                                                                                      
For assistance after hours, please call my cell at: (1-978-807-7286)

Annual Roads and Sidewalk Restoration Program

As you may already be aware, the following roads are part of the annual roads and sidewalk restoration program and will have detours in place during construction starting Monday, September 22nd beginning at the intersection of Great Pond Road and Osgood Street:

  • Great Pond Road: Osgood Street to Bradford Street
  • Great Pond Road: 1116 Great Pond Road to Essex Street
  • Morningside Lane: Winter Street to Russett Lane
  • Great Pond Road: Marbleridge Road to Fox Hill Road

The following roads will have road closures in place during construction:

  • Pond Street: Bradford Street to Town Line
  • Gray Road: Boston Street to Town Line

The following roads will be open to through traffic only:

  • Ferncroft Circle: South Bradford Street to Cul-de-sac
  • Bridle Path: Great Pond Road to Cul-de-sac
  • Pleasant Street: Fox Hill Road to Great Pond Road

Traffic delays, and raised castings should be expected if travelling within these areas. A town representative will be on site during construction. We appreciate your understanding. For any questions, please do not hesitate to reach out to the engineering department. Thank you.




detours.jpg

Annual Roads and Sidewalk Restoration Program

As you may already be aware, the following roads are part of the annual roads and sidewalk restoration program and are scheduled for daytime construction work, weather permitting, starting the week of Monday, September 22nd:

  • Great Pond Road: Osgood Street to Bradford Street
  • Pond Street: Bradford Street to Town Line
  • Great Pond Road: 1116 Great Pond Road to Essex Street
  • Morningside Lane: Winter Street to Russett Lane
  • Ferncroft Circle: South Bradford Street to Cul-de-sac
  • Bridle Path: Great Pond Road to Cul-de-sac
  • Great Pond Road: Marbleridge Road to Fox Hill Road
  • Gray Road: Boston Street to Town Line

Traffic delays, detours and raised castings should be expected if travelling within these areas. A town representative will be on site during construction. We appreciate your understanding. For any questions, please do not hesitate to reach out to the engineering department. Thank you.

 

Road & Sidewalk Restoration.png

North Andover Road Construction and Road Closures: https://www.google.com/maps/d/u/0/edit?mid=1mIZ595U9u8V24b9vMll_VdH6y6oQbP4&usp=sharing

Cancelled: ABECC School Council Mtg

Please note the Massachusetts Secretary of State's office has determined that most emails to and from municipal offices and officials are public records. For more information please refer to: http://www.sec.state.ma.us/pre/preidx.htm.

Please consider the environment before printing this email.