Annual Roads and Sidewalk Restoration Program

As you may already be aware, the following roads are part of the annual roads and sidewalk restoration program and are scheduled for daytime construction work, weather permitting, starting the week of Monday, September 22nd:

  • Great Pond Road: Osgood Street to Bradford Street
  • Pond Street: Bradford Street to Town Line
  • Great Pond Road: 1116 Great Pond Road to Essex Street
  • Morningside Lane: Winter Street to Russett Lane
  • Ferncroft Circle: South Bradford Street to Cul-de-sac
  • Bridle Path: Great Pond Road to Cul-de-sac
  • Great Pond Road: Marbleridge Road to Fox Hill Road
  • Gray Road: Boston Street to Town Line

Traffic delays, detours and raised castings should be expected if travelling within these areas. A town representative will be on site during construction. We appreciate your understanding. For any questions, please do not hesitate to reach out to the engineering department. Thank you.

 

Road & Sidewalk Restoration.png

North Andover Road Construction and Road Closures: https://www.google.com/maps/d/u/0/edit?mid=1mIZ595U9u8V24b9vMll_VdH6y6oQbP4&usp=sharing